Cookie policy: This site uses cookies (small files stored on your computer) to simplify and improve your experience of this website. Cookies are small text files stored on the device you are using to access this website. For more information on how we use and manage cookies please take a look at our privacy and cookie policies. Some parts of the site may not work properly if you choose not to accept cookies.

sections
 

eaton

Results 1 - 25 of 42Sort Results By: Published Date | Title | Company Name
Published By: Eaton     Published Date: Sep 29, 2017
Exploiting the Software Advantage Lessons from Digital Disrupters
Tags : 
datacenter, cloud, technology, digital, datacenter, datacentre_strategy_and_evolution, networking, data center
    
Eaton
Published By: Eaton     Published Date: Sep 29, 2017
The possible “outages” that might have been forgotten. Uninterruptible Power Supplies and Power Distribution - Power Distribution + UPS
Tags : 
datacenter, power, outage, energy, network, series_of_eaton_white_papers
    
Eaton
Published By: Eaton     Published Date: Sep 29, 2017
The possible “outages” that might have been forgotten Uninterruptible Power Supplies and Power Distribution - Power Distribution + UPS - Part 2
Tags : 
datacenter, power, outage, energy, network, series_of_eaton_white_papers
    
Eaton
Published By: Eaton     Published Date: Sep 29, 2017
The possible “outages” that might have been forgotten - Power Distribution
Tags : 
datacenter, power, outage, energy, network, series_of_eaton_white_papers
    
Eaton
Published By: Eaton     Published Date: Sep 29, 2017
UPS installation safety requirements
Tags : 
datacenter, power, outage, energy, network, series_of_eaton_white_papers
    
Eaton
Published By: Eaton     Published Date: Oct 04, 2019
Safety has always been Eaton’s highest priority and we work closely with the NEC (National Electric Code) to ensure new policies continue to protect our most valuable resources, people. Eaton, the NEC, NEMA, and other organizations have long maintained that molded case circuit breakers are not suitable for repair or refurbishment. While changes to the code for 2020 do not change that position, they do provide clarity on what it means to be refurbished and what is now required when a suitable product is refurbished, including clearly marking the item as refurbished and removing the original manufacturer’s listing mark. The new code distinguishes between general maintenance like replacing a breaker, and refurbishment, altering a piece of equipment to a once again operational state. Because a refurbished unit cannot be tested to the manufacturer’s test protocol, it cannot continue to carry the original listing mark. Read the article below and learn about "reconditioned", and what the NEC is doing to reinforce that UL489 molded case circuit breakers are not suitable for refurbishment or repair.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jul 09, 2018
Our industry has made numerous technological advances designed to protect homeowners, businesses and electrical workers. That makes every fatal electrocution in the home all the more distressing. Between 2010 and 2013, the U.S. saw an estimated average of 48 electrocution fatalities associated with consumer products per year, with large and small electric appliances chief among them1. Tragedies like these can be avoided, especially when the ground fault circuit interrupter (GFCI) technologies needed to prevent dangerous events are readily available. As the principle NEMA representative at the National Electrical Code (NEC) Code-Making Panel Two, I saw public input asking for increased GFCI protection for the home during the 2017 code cycle. The code panel expanded the GFCI requirement for facilities other than dwelling units as part of section NEC 210.8(B). However, residential standards improvements were sidelined.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jul 09, 2018
Code updates happen for one main reason: safety improvement. NEC (National Electrical Code) Article 408.3 helps take electrical safety for service entrance panels to a new level. The code, updated in 2017, includes provisions to provide shock protection via panelboard barriers. The barriers protect from energized conductors on the line terminals of the main overcurrent protection device (OCPD) in a panelboard. When the main circuit breaker in a panel is turned off, line side terminals and conductors remain energized from upstream via the utility or another panelboard. With these barriers in place and the main OCPD turned off, installers are better protected when pulling wires into the panelboard. Today, all panelboards are shipped with shock-protective barriers. However, barriers are new to installation procedures, so contractors may not recognize them and accidentally throw them out—easily and often.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jun 12, 2018
We’re all human and we all make mistakes. But mistakes in the electrical field can prove costly. Codes and standards work together to reduce mistakes and save lives, which is what makes NEC (National Electrical Code) Section 240.87, Incident Energy Reduction, so significant.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jul 12, 2019
Every three years, members of the National Fire Protection Association (NFPA) meet to review, modify and add new National Electrical Code (NEC), or NFPA 70, requirements to enhance electrical safety in the workplace and the home. This year’s code review is well underway: the second draft of NEC 2020 is complete and the annual NFPA Conference and Expo is scheduled for late June. What follows is a preview of what are, in my opinion, the most significant code changes on track to pass. In this blog, I’ll explore the reasoning for each change and the future steps the NEC may take beyond 2020 regarding: Ground fault circuit interrupter (GFCI) protection Service entrance equipment Reconditioned equipment Performance testing Load calculations Available fault current and temporary power This is a high-level overview. In the coming months, my Eaton colleagues and I will dig deeper into each topic as part of a continuing series on the 2020 code review cycle.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jul 12, 2019
The production of counterfeit products is an increasing problem that affects the entire electrical industry. Counterfeit protective devices, like circuit breakers, including GFCI and AFCI for personal protection, pose one of the most significant risks to facility and employee safety. Because counterfeit products are more difficult to detect than ever, we as an industry must do more to guard against their risks and liabilities. By purchasing products from authorized resellers and using available tools to authenticate products, buyers can ensure a safer supply chain that mitigates the risk sub-standard and counterfeit electrical safety devices pose.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jul 12, 2019
Working on energized equipment is one of the more dangerous scenarios technicians face in the field. As a result, there’s been a concerted industry effort to improve the understanding of electrical shock and arc flash hazards. I believe one of the most important standards in this safety push is the restructured language within the 2018 edition of the National Fire Protection Agency’s (NFPA’s) 70E “Standard for Electrical Safety in the Workplace.” In the past, the standard addressed electrical hazards and risks holistically when considering energized electrical work. But today’s latest guidelines now identify hazards and risks independently and include recommendations for a thorough risk analysis that considers the hazard, the planned work task and potential human error. Together, the changes result in a clearer understanding of energized work and help reduce electrical incidents.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jan 26, 2016
When working with data center and commercial facility electrical systems, shocks of 100mA to more than 2,000mA are possible—definitely in the realm of serious harm to humans and property. Energized electrical equipment also presents the risk of arc flash caused by electrical faults that produce powerful explosions. When dealing with commercial and industrial electrical systems, such as uninterruptible power systems (UPSs) and their batteries, data center and facilities managers need to be aware of these risks, especially since some repair and maintenance procedures require working with a unit that is still energized. There are ways to minimize the risks to employees, equipment and the field technician performing the service. This paper answers some common questions about UPS maintenance, how to reduce the risks associated with servicing UPSs and batteries, and how to qualify a UPS service provider.
Tags : 
eaton, ups safety, data center, arc flash, energized electrical equipment, facility managers, ups maintenance, it management
    
Eaton
Published By: Eaton     Published Date: Jan 26, 2016
Arc flashes—the fiery explosions that can result from short circuits in high-power electrical devices—kill hundreds of workers in the U.S. every year and permanently injure thousands more. They can also wreak financial havoc in the form of fines, lawsuits, and damage to expensive equipment. This white paper aims to fill that knowledge gap by providing introductory-level information about what arc flashes are and what you can do to prevent them.
Tags : 
eaton, arc flashes, data center solutions, data centers, it management, enterprise applications
    
Eaton
Published By: Eaton     Published Date: Jan 26, 2016
This white paper discusses the issues making data center cooling more challenging than ever and explains why starting the data center design process with the racks rather than the room can help businesses reduce energy consumption, increase capacity and optimize floor space utilization.
Tags : 
eaton, data center design, data center cooling, floor space utilization, data center solutions, it management, enterprise applications
    
Eaton
Published By: Eaton     Published Date: Jan 26, 2016
Cloud computing vendors and colocation data centers make every effort to maximize the scalability, efficiency and agility of their data centers. As a result, more and more of them are looking into replacing older, transformer-based centralized power protection schemes with distributed architectures in which uninterruptible power systems (UPSs) reside in the white space (or data hall). This white paper describes the advantages of positioning UPSs in the white space as well as the essential qualities to look for in a white space-ready UPS.
Tags : 
eaton, data center trends, white space, upss, uninterruptible power systems, data hall, it management, enterprise applications
    
Eaton
Published By: Eaton     Published Date: Jan 26, 2016
This white paper explains why many data centers are ill-equipped to support today’s most important new technologies; discusses why packaged power and cooling solutions can be a flawed way to upgrade existing facilities; and describes the core components of a data center upgrade strategy capable of enhancing efficiency and power density more completely and cost-effectively.
Tags : 
eaton, modern data centers, data center solutions, virtualization, big data, converged infrastructures, it management, enterprise applications
    
Eaton
Published By: Eaton     Published Date: Jan 26, 2016
When designing a power protection scheme for their data center, IT and facilities managers must ask themselves whether a distributed or centralized backup strategy makes more sense. Unfortunately, there is no easy answer to that question. Companies must weigh each architecture’s advantages and disadvantages against their financial constraints, availability needs and management capabilities before deciding which one to employ. This white paper will simplify the decision-making process and lessen the potential weaknesses of whichever strategy you ultimately select.
Tags : 
eaton, distributed backup strategy, centralized backup strategy, facility managers, data center solutions, it management, enterprise applications
    
Eaton
Published By: Eaton     Published Date: Jan 26, 2016
This white paper discusses the forces shaping today’s data centers and describes the capabilities businesses should look for when selecting PDUs.
Tags : 
eaton, pdus, data centers, rack power distribution, operating efficiency, multi-tenant data centers, it management, enterprise applications
    
Eaton
Published By: Eaton     Published Date: Mar 07, 2016
Explore this brochure to see how RackPack IT can save you time and money while allowing you to organize, protect and manage your environment more effectively.
Tags : 
rackpack it, organization, power management solution, eaton, onsite assembly, installation, it management
    
Eaton
Published By: Eaton     Published Date: Mar 07, 2016
See how the performance of the 9395 blew Hurricane Electric away, and why the company is installing more units to meet its influx of new customers.
Tags : 
eaton, colocation facilities, colocation providers, data centers, uptime, capacity, eaton power xpert 9395 ups, it management
    
Eaton
Published By: Eaton     Published Date: Mar 07, 2016
The 9PX delivered on every requirement, providing high availability and efficiency in a centralized solution. Magic Springs also gained up to 28 percent more wattage than comparable UPSs, with an exceptional power factor that positions them for future growth. Learn more about how the 9PX ensured a smooth ride for Magic Springs, while fitting their projected power needs for the next five years.
Tags : 
eaton, upss, uninterrubtible power system, equipment protection, eaton 9px ups, efficiency, wattage, it management
    
Eaton
Published By: Eaton     Published Date: Mar 07, 2016
In their search for top-of-the-class uninterruptible power systems (UPSs) for their demanding data center environment, WUSD wanted a system that would keep everything backed up with enough runtime for a graceful shutdown, but was also easily scalable. Equally important, the district wanted seamless integration with their virtual environment. Find out how the Eaton 9390 UPS and the Eaton Intelligent Power Software (IPS) Suite made the grade.
Tags : 
upss, uninterruptible power systems, data center environment, backup, shutdown, scalability, integration, it management
    
Eaton
Published By: Eaton     Published Date: Feb 09, 2017
In this white paper, Eaton experts give you an introductory overview of what a UPS is, and what kinds of UPSs are available, along with a comprehensive guide to matching the right UPS and accessories to your needs.
Tags : 
uninterrubtible power systems, electicity, eaton, dependability, it power supply, ups accessories, it management
    
Eaton
Published By: Eaton Corp.     Published Date: Jun 01, 2009
Virtualization can deliver dramatic benefits for data centers, but it can also stress the underlying support infrastructure.  Power and cooling systems—which may have been quite sufficient for pre-virtualization needs—could easily become inadequate when data center performance patterns are radically altered.  This paper describes some of power challenges related to virtualization—and the readily available technologies to address them.
Tags : 
virtualization, data center, infrastructure management, power, cooling, monitoring., networking, infrastructure
    
Eaton Corp.
Previous   1 2    Next    
Search      

Related Topics

Add Research

Get your company's research in the hands of targeted business professionals.