Cookie policy: This site uses cookies (small files stored on your computer) to simplify and improve your experience of this website. Cookies are small text files stored on the device you are using to access this website. For more information on how we use and manage cookies please take a look at our privacy and cookie policies. Some parts of the site may not work properly if you choose not to accept cookies.

sections
 

data center design

Results 1 - 25 of 109Sort Results By: Published Date | Title | Company Name
Published By: Schneider Electric     Published Date: May 05, 2016
This paper proposes standard terminology for categorizing the types of prefabricated modular data centers, defines and compares their key attributes, and provides a framework for choosing the best approach(es) based on business requirements.
Tags : 
datacenters, tco, capacity, modular design, load, cost, architecture, networking
    
Schneider Electric
Published By: Schneider Electric     Published Date: May 05, 2016
This white paper provides a quantitative TCO analysis of the two architectures, and illustrates the key drivers of both the capex and opex savings of the improved architecture.
Tags : 
datacenters, tco, capacity, modular design, load, cost, architecture, networking
    
Schneider Electric
Published By: Schneider Electric     Published Date: May 05, 2016
In this paper, we focus on quantifying the capital cost differences of a prefabricated vs. traditional 440 kW data center, both built with the same power and cooling architecture, in order to highlight the key cost drivers, and to demonstrate that prefabrication does not come at a capex premium.
Tags : 
datacenters, tco, capacity, modular design, load, cost, architecture, networking
    
Schneider Electric
Published By: Schneider Electric     Published Date: Aug 21, 2017
This 12-page white paper describes what a data center reference design is, what it includes, and explains how the benefits listed above are achieved. A data center reference design acts as a starting point offering a project team several valuable benefits including: • Facilitating and simplifying the planning phase • Reducing time to create buildable designs • Reducing risk, offering predictable performance and improved reliability of the data center once operational
Tags : 
data center, design, reference design
    
Schneider Electric
Published By: Armstrong Fluid     Published Date: May 26, 2016
This paper will explore the concept behind Ultra-Efficient data center chilled water system design and control integration that will see an additional 40 to 60 percent energy savings in today's best-in-class variable-speed chilled water systems.
Tags : 
cooling, data center, system design, pumps, chiller, networking
    
Armstrong Fluid
Published By: Commscope NL     Published Date: Nov 29, 2016
This white paper addresses some pain points for data center managers: > Uncertainty about future technologies > Complexity of the network > Scale/upgrade without disruption > Lack of engineering guidelines
Tags : 
commscopenl, data center
    
Commscope NL
Published By: Commscope     Published Date: Nov 29, 2016
This white paper addresses some pain points for data center managers: > Uncertainty about future technologies > Complexity of the network > Scale/upgrade without disruption > Lack of engineering guidelines
Tags : 
commscope dach, data center
    
Commscope
Published By: LeGrand     Published Date: Oct 18, 2016
Efficiency is a key objective when designing a data center. Efficiency gains are typically focused completely on power and cooling. Efficiencies can be realized in many other areas resulting in additional cost savings, reliable network performance, easier maintenance, flexibility, and scalability.
Tags : 
data center, connection, design, performance, time, space, experience, legrand, networking, security
    
LeGrand
Published By: Alcatel-Lucent     Published Date: Dec 02, 2009
Faster, more powerful and dense computing hardware generates significant heat and imposes considerable data center cooling requirements.
Tags : 
data center design and management, distributed computing, internetworking hardware, power and cooling
    
Alcatel-Lucent
Published By: Commvault     Published Date: Jul 06, 2016
Today, nearly every datacenter has become heavily virtualized. In fact, according to Gartner as many as 75% of X86 server workloads are already virtualized in the enterprise datacenter. Yet even with the growth rate of virtual machines outpacing the rate of physical servers, industry wide, most virtual environments continue to be protected by backup systems designed for physical servers, not the virtual infrastructure they are used on. Even still, data protection products that are virtualization-focused may deliver additional support for virtual processes, but there are pitfalls in selecting the right approach. This paper will discuss five common costs that can remain hidden until after a virtualization backup system has been fully deployed.
Tags : 
storage, backup, recovery, best practices, networking, it management, enterprise applications
    
Commvault
Published By: Equinix     Published Date: May 18, 2015
This white paper explores how CIOs and business leaders need to think much more broadly about how their technology fits into a global network of services due to the rise of cloud infrastructure, software as a service, the global data foot­print, and mobile apps.
Tags : 
hybrid cloud, technology, data center, global network, cloud computing, cloud, cloud infrastructure, mobile apps, software, cloud design challenges, public cloud, private cloud, public cloud vs private cloud, proximity, public cloud limits, benefits of hybrid cloud, network management
    
Equinix
Published By: Larsen & Toubro Infotech(LTI)     Published Date: May 30, 2019
Leading technology conglomerate had to renew the current data center agreement, also it was no longer strategic to maintain their own hardware. LTI partnered with Oracle and helped in designing and executing the migration plan that would ensure Zero business disruption without stringent timeline. LTI leveraged a toolkit built by its in-house, dedicated Oracle Innovation and Solution Center (OISC) to help ensure an error-free migration. Benefits i. $1 M Overall Cost saving ii. 40% reduced TAT Download full case study.
Tags : 
    
Larsen & Toubro Infotech(LTI)
Published By: Juniper Networks     Published Date: May 04, 2018
Business leaders are eager to leverage new technologies, and IT leaders can't afford to fall behind. Hybrid IT environments take advantage of private and public clouds but need enhanced security, automation, orchestration, and agility.
Tags : 
    
Juniper Networks
Published By: Schneider Electric     Published Date: Oct 17, 2016
This paper outlines practical steps that include clear methodologies, at-a-glance calculators and tools, and a comprehensive library of reference designs to simplify and shorten your planning process while improving the quality of the plan.
Tags : 
    
Schneider Electric
Published By: SolidFire_NetApp     Published Date: May 10, 2016
When comparing the architecture for Ceph and SolidFire, it is clear that both are scale-out storage systems designed to use commodity hardware, and the strengths of each make them complementary solutions for datacenter design.
Tags : 
data management, business practices, data center. data application, enterprise applications, business intelligence, solutions
    
SolidFire_NetApp
Published By: Schneider Electric     Published Date: Mar 28, 2019
Implementing prefabricated modular data centers results in well-understood benefits including speed of deployment, predictability, scalability, and lifecycle cost. The process of deploying them – from designing the data center, to preparing the site, to procuring the equipment, to installation – is quite different than that of a traditional data center. This paper presents practical considerations, guidance, and results that a data center manager should expect from such a deployment.
Tags : 
predictability, scalability, life cycle cost, schneider electric, - prefabricated data center, modular data center, data center design, data center manager
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 28, 2019
To win the colocation race you need to be faster, reliable, innovative and efficient –all while making smarter design choices that will ensure positive returns. Customers are demanding 100% uptime and always-on connectivity –be it small enterprises to large Internet Giants–and colocation providers need to meet these expectations. The growing adoption of prefabricated data centers allows just that. With the undisputed benefits of prefab modules and building components(like speed or quality),colocation providers can manage their business today, and deploy faster in the future. Chris Crosby, CEO for Compass Datacenters, is well-known for his expertise in the data center industry. From its founding in 2012, Compass’ data center solutions have used prefabricated components like exterior walls and power centers to deliver brandable, dedicated facilities for colocation providers. Prefabrication is the central element of the company’s “Kit of Parts” methodology that delivers customizable data center solutions from the core to the edge. By attending this webinar, colocation providers will: • understand the flexibility and value delivered via the use of prefabricated construction • Hear the common misperceptions regarding prefabricated modules and data center components • learn how prefabricated solutions can provide more revenue generation capability than competing alternatives • know what key things to consider when evaluating prefabricated data center design
Tags : 
data centers, colocation provider, schneider electric, - modular data centers, prefabricated data center
    
Schneider Electric
Published By: Schneider Electric     Published Date: May 31, 2019
Data center designs have become much more safe, reliable, & efficient. However, we must continue to adopt new designs & emerging technologies to stay ahead of the pace of change. In this webinar, Steve Wallage, Managing Director of BroadGroup Consulting, shares his expertise to help global colocation providers: 1. Learn what changes colocation providers can make to adapt to the marketplace 2. Understand the future requirements of hyperscale cloud players 3. Hear of successful projects around the world and why they succeeded
Tags : 
data center, business growth, schneider electric
    
Schneider Electric
Published By: IBM     Published Date: May 02, 2013
The explosion in IT demand has intensified pressure on data center resources, making it difficult to respond to business needs, especially while budgets remain flat. As capacity demands become increasingly unpredictable, calculating the future needs of the data center becomes ever more difficult. The challenge is to build a data center that will be functional, highly efficient and cost-effective to operate over its 10-to-20-year lifespan. Facilities that succeed are focusing on optimization, flexibility and planning—infusing agility through a modular data center design.
Tags : 
modular, data center, efficient, optimization, flexibility, cost-effective
    
IBM
Published By: Larsen & Toubro Infotech(LTI)     Published Date: Mar 28, 2019
Leading technology conglomerate had to renew the current data center agreement, also it was no longer strategic to maintain their own hardware. LTI partnered with Oracle and helped in designing and executing the migration plan that would ensure Zero business disruption without stringent timeline. LTI leveraged a toolkit built by its in-house, dedicated Oracle Innovation and Solution Center (OISC) to help ensure an error-free migration. Download complete case study.
Tags : 
    
Larsen & Toubro Infotech(LTI)
Published By: Lenovo - APAC     Published Date: Oct 11, 2018
Business expectations and demands on the data center are increasing and the impact on today’s data centers is staggering. Organisations that can move quickly to leverage these new opportunities will find themselves in an advantageous position relative to their competitors. But time is NOT on your side! If your IT team often feel that they’re always in catch-up mode because it is difficult to quantify IT contributions, it is time to understand the benefit of hyperconverged infrastructure. Download this premium guide to understand how HCI can • Provide the resilience, scalability and performance to run all your applications without compromise. • Design the data center as a fluid resource that can immediately adapt to the evolving needs of the business. • Enable agility with scale-out architecture that eliminates the need to rip and replace for seamless growth and scale.
Tags : 
    
Lenovo - APAC
Published By: NetApp     Published Date: Sep 21, 2017
A visual infographic highlighting the five architectural principles of developing the Next Generation Data Center (NGDC), including scale-out, guaranteed performance, automated management, data assurance, and global efficiencies. This infographic typically accompanies the white paper, Designing the Next Generation Data Center, which is more in-depth account of the 5 principles.
Tags : 
netapp, database performance, flash storage, data management, cost challenges, data
    
NetApp
Published By: Oracle     Published Date: Jan 28, 2019
Oracle Engineered Systems are architected to work as a unified whole, so organizations can hit the ground running after deployment. Organizations choose how they want to consume the infrastructure: on-premises, in a public cloud, or in a public cloud located inside the customer’s data center and behind their firewall using Oracle’s “Cloud at Customer” offering. Oracle Exadata and Zero Data Loss Recovery Appliance (Recovery Appliance) offer an attractive alternative to do-it-yourself deployments. Together, they provide an architecture designed for scalability, simplified management, improved cost of ownership, reduced downtime, zero-data loss, and an increased ability to keep software updated with security and patching. Download this whitepaper to discover ten capabilities to consider for protecting your Oracle Database Environments.
Tags : 
    
Oracle
Published By: Schneider Electric     Published Date: Nov 17, 2016
Today’s data center power and cooling infrastructure has roughly 3 times more data points / notifications than it did 10 years ago. Traditional data center remote monitoring services have been available for over 10 years but were not designed to support this amount of data monitoring and the associated alarms, let alone extract value from the data. This paper explains how seven trends are defining monitoring service requirements and how this will lead to improvements in data center operations and maintenance.
Tags : 
schneider electric, digital remote monitoring, data center operations, maintenance, enterprise applications, infrastructure
    
Schneider Electric
Published By: Nutanix, Inc.     Published Date: May 02, 2013
Enterprise data-centers are straining to keep pace with dynamic business demands, as well as to incorporate advanced technologies and architectures that aim to improve infrastructure performance, scale and economics. meeting these requirements, however, often requires a complete rethinking of how data centers are designed and managed. Fortunately, many enterprise IT architects are leading cloud providers have already demonstrated the viability and the benefits of a more modern, software-defined data center. This Nutanix white paper examines eight fundamental steps leading to a more efficient, manageable and scalable data center.
Tags : 
nutanix, data-centers, dynamic business demands, advanced technologies, it management, enterprise applications
    
Nutanix, Inc.
Start   Previous   1 2 3 4 5    Next    End
Search      

Related Topics

Add Research

Get your company's research in the hands of targeted business professionals.